info@khalif-ing.com

Our projects



Relocation and reinstallation of two soap production lines.

Construction and installation of 3 concrete plants elkon delivered turnkey.

Construction of Several metal frameworks between [ 1500 - 10,000 ] m2

Complete automation of PLC and HMI of 2 cocoa plants with more than 1500 outputs 8 supervision positions 08 desks.

Construction of several life bases [prefabricated containers]

Manufacture and installation of storage tanks between [500 and 1500] m3

Electrical rehabilitation of Palme factories

Installation and maintenance of electrical substations

Several paving works between [ 1500 - 10,000 ] m2.

Installation and connection of utilities